CatalystTechnologyMid cap11/9/26 (17d ago)closed Nov 11, 2026
Held2 days
Entry$12.39Close$13.18PnL+6.42%
80%
confidence
Angle CB-4 rent starts this quarter as HPC leases already make up 83% of revenue after the AI pivot.
TeraWulf’s Q3 confirmed the AI infrastructure transition is now driving the income statement: revenue beat at $76.2M, HPC lease revenue reached $63M, and HPC represented roughly 83% of total revenue [#2, #4, #11]. The next leg is rental conversion from contracted capacity, with CB-4 income starting in Q4 2026 and phased delivery targeted for Nov-Dec, followed by CB-5 in Q1 2027 [#2, #34].
Catalyst CB-4 phased delivery and rental income beginning in Q4 2026 are the near-term re-rating window.
AI Status:WULF closed after two sessions with a realized gain of 6.42% as HPC lease momentum lifted the name before our exit signal ended the trade.
The pick entered near 12.38 and exited at 13.18 for a 6.42% result after roughly two trading days, well below the intra-trade peak gain of 8.44% and after a drawdown of about 4.97% from highs. Price had reclaimed the short-term EMA while the broader stack stayed in a downtrend and DMI showed stronger selling pressure despite daily MACD histogram turning up. The trade ran its course on our exit signal rather than riding the full CB-4 rental narrative.